da betsul: No play was possible on the second day of the Quaid-e-Azam Trophy final between Habib Bank Limited and Sui Northern Gas Pipelines Limited due to rain and subsequently a wet outfield
da fezbet: The Bulletin by Faras Ghani in Karachi08-Jan-2008
Scorecard
No play was possible on the second day of the Quaid-e-Azam Trophy final between Habib Bank Limited (HBL) and Sui Northern Gas Pipelines Limited (SNGPL) due to rain and subsequently a wet outfield.A total of 25 overs were lost yesterday due to bad light and as players took the field for warm-up, heavy rain lashed the entire city forcing the square to be covered. Although the covers did come off post-lunch, rain water had seeped through onto the pitch and the square forcing the umpires to call off play at 3.15pm local time.Keeping the inclement weather forecast in mind, the Pakistan board has already kept areserve day in order to obtain a result providing a winner is not declared on first-innings lead over the span of five days.






